Eagle Lake Sewer Utility District


Warning: end() expects parameter 1 to be array, null given in /home/ati/public_html/wp-content/themes/Stellar_Responsive/single-sbproject.php on line 92

Warning: Invalid argument supplied for foreach() in /home/ati/public_html/wp-content/themes/Stellar_Responsive/single-sbproject.php on line 95
type:

Warning: Invalid argument supplied for foreach() in /home/ati/public_html/wp-includes/functions.php on line 3504

Warning: join(): Invalid arguments passed in /home/ati/public_html/wp-content/themes/Stellar_Responsive/single-sbproject.php on line 106
services:
Planning, Design, Clean Water Fund financing, Construction, O&M manual/Startup

doverThe Eagle Lake Sewer Utility District hired ATI to upgrade its outdated wastewater treatment plant. The current plant lacked sustainable pumps and controls in each lift station while the backup generators were in need of repair. All four lift stations were fitted with new pumps, controls, generators and level indicators.

Features

Facilities planning

Design

Clean Water Fund financing

Construction administration

O&M manual/startup