Milwaukee MSD, Wisconsin

Aqueducts

type:
Structural, Civil
services:
Design, Construction administration and inspection

Design capacity:  35 cu ft per second (Estabrook Park) and 50 cu ft per second (Auer Avenue)

Construction cost:  $800,000

 

Features

Above ground gravity sewer

Box section bridge design

Walking/biking path on top

Decorative arches and detailing

Estabrook Park Aqueduct:  Three span bridge, 124 feet long, 48-inch diameter sewer

Auer Avenue Aqueduct:  Eight span bridge, 264 feet long, 60-inch diameter