Ohio Combined Wastes Facility, Phase 1

type:
Waste Management
services:
Sludge digestion report, Permitting, Design engineering, Services during construction, Operational assistance

Flow:  33,000 gpd

TSS:  27,400 lbs/day

Cogeneration:  350 kW

Construction Cost:  $5 million

 

Features
Processes biosolids and merchant wastes
High solids, plug flow, primary digester
Complete mix secondary digester
Combined, biogas-powered heat and power IC engine
Centrifuge sludge dewatering