Share Post this to Facebook Tweet this Share this on Linkedin Pin this on Pinterest Share this via email

South Carolina Prepared Foods Producer

Wastewater Pretreatment System

type:
Waste Management
services:
Bench-scale study, Predesign study, Permitting assistance, Design engineering, Services during construction, Startup assistance

Flow: 150,000 gpd

COD: 2,000 lbs/day

TSS: 1,200 lbs/day

 FOG: 800 lbs/day

Construction Cost:  $900,000

 

Features

Influent flow equalization

DAF pretreatment

Belt press dewatering of float

 Aerated lagoon biological treatment

Effluent flow control and pH adjustment

Effluent discharge to POTW