Our Portfolio
Wisconsin Whey Processor
- type:
- Waste Management
- services:
- Preliminary engineering report, Design engineering, Permitting, Construction services, Startup assistance
Flow: 180,000 gpd
COD: 5,800 lbs/d
Construction Cost: $1.8 million
Features
Replacement of aerated lagoon system with activated sludge system
Mixed influent equalization tank
Oxidation ditch with WAS pumping
Secondary clarifier and RAS pumping
Gravity belt thickener for WAS
Thickened sludge storage
WWTP building for thickener
MCC and controls
Effluent discharge to stream