Our Portfolio
Wisconsin Dairy Ingredients Processor
- type:
- Waste Management
- services:
- Design engineering, Services during construction, Startup and operational assistance
Wastewater Pretreatment System
Flow: 50,000 gpd
COD: 6,250 lbs/day
TSS: 625 lbs/day
FOG: 300 lbs/day
TKN: 65 lbs/day
Construction Cost: $1.3 million
Features
Equalization
Complete mix anaerobic contact process
Mixed liquor heating system
Oxidation ditch (Orbal) with biological phosphorus removal and nitrification
Odorous air biofilter
Effluent discharge to POTW