Our Portfolio
Wisconsin Whey Processor
Wastewater Treatment System Upgrade
- type:
- Waste Management
- services:
- Design engineering, Equipment procurement assistance, Services during construction, Startup and operational assistance
Flow: 250,000 gpd
COD: 13,350 lbs/day
TKN: 200 lbs/day
Construction Cost: $1.1 million
Features
Influent equalization
UASB anaerobic process
Aerobic sequencing batch reactors
Effluent filtration
Laboratory, offices, computer control system
Effluent discharge to stream